Site development and construction of (1) 113,000sf and (1) 58,000sf Type III-B buildings. Scope included PG&E rule 20 and Rule 16 work. AT&T and Comcast infrastructure. Site lighting and site power for future EV Charging stations and retention pond pumps. Scope also included a Design build Fire Alarm system and diesel powered fire protection pump with all power and control connections.