Quality Control

Quality Control

Wilhite Electric Inc. infuses quality control into every facet of the project. We thoroughly understand the client’s appreciation will persist long after the project is complete. We insist on excellence throughout the process beginning with preconstruction. Our preconstruction team strives to provide excellent service for all projects in any method of delivery. From design-build to hard bid we will provide our clients with complete electrical preconstruction services. 

Our project managers pick up where Preconstruction left off. The project manager will examine the construction documents and perform their own take off, double checking the efforts of the preconstruction team. The project managers perform the buyout and schedule the timely delivery of all materials. Any long lead items are identified and scheduled to be delivered to the jobsite on time. Any problems are identified early and solved through the RFI process. The submittal process is expedited with utmost attention to detail. A project to-do list is created for every project, which we label as the master list. This list assigns responsibilities to the admin, project manager and field personnel for materials, submittals, RFI’s, change requests, and miscellaneous open items with date listed, date due, and completion dates. The master list guarantees a top quality and timely project. At Wilhite Electric Inc. we take quality seriously.

The following is a list of forms that we use during quality control checks and commissioning:

  • Pretask plan
  • Job hazard analysis
  • Pre-functional checklist
  • Room-by-room checklist
  • Specification checklist
  • Device (testing form)
  • Feeder megger (testing form)
  • Feeder voltage (testing form)
  • Generator (testing form)
  • Resistance to ground (testing form)
  • Ground test (testing form)
  • Pre-final punch
  • Torque bolts (testing form)
  • Underground conduit (testing form)
  • Spare part checklist
  • Lighting control (commissioning report)